ITAC Assessment: KU0181
ITAC logo
ITAC Assessment: KU0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLASTIC MOLDED CONTAINER
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 6,168
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,623 1,961,899
kWh
Natural Gas $8,831 2,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,538

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $10,210 $1,200 $11,430
169,109
kWh
$(-1,220.0)
-
MMBtu
-
02 2.4312: Improve lubrication practices $2,813 $750 $2,813
41,618
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $1,466 $3,000 $1,466
21,688
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,446 $600 $1,446
21,395
kWh
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $891 $150 $891
13,189
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $260 - - $430
-
MMBtu
$(-170.0)
07 2.1123: Install automatic stack damper $688 $700 - $688
-
MMBtu
-
08 3.4154: Eliminate leaks in water lines and valves $178 $100 $178
2,638
kWh
- -
TOTAL RECOMMENDED $17,952 $6,500 $18,224
269,637
kWh
$(-102.0)
-
MMBtu
$(-170.0)
TOTAL IMPLEMENTED $15,538 $2,800 $16,758
247,949
kWh
$(-1,220.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs