| Assessment Year | 1985 |
|---|---|
| Principal Product | PLASTIC MOLDED CONTAINER |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 25 |
| Plant Area |
n/a
|
| Annual Production | 2,500,000
lb
|
| Production Hrs. Annual | 6,168
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,623 | 1,961,899 |
kWh
|
$0.068 |
| Natural Gas | $8,831 | 2,093 |
MMBtu
|
$4.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,952 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,538 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $10,210 | $1,200 |
$11,430
169,109
kWh
|
$(-1,220.0)
-
MMBtu
|
- | |
| 02 | 2.4312: Improve lubrication practices | $2,813 | $750 |
$2,813
41,618
kWh
|
- | - | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $1,466 | $3,000 |
$1,466
21,688
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,446 | $600 |
$1,446
21,395
kWh
|
- | - | |
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $891 | $150 |
$891
13,189
kWh
|
- | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $260 | - | - |
$430
-
MMBtu
|
$(-170.0) | |
| 07 | 2.1123: Install automatic stack damper | $688 | $700 | - |
$688
-
MMBtu
|
- | |
| 08 | 3.4154: Eliminate leaks in water lines and valves | $178 | $100 |
$178
2,638
kWh
|
- | - | |
| TOTAL RECOMMENDED | $17,952 | $6,500 |
$18,224
269,637
kWh
|
$(-102.0)
-
MMBtu
|
$(-170.0) | ||
| TOTAL IMPLEMENTED | $15,538 | $2,800 |
$16,758
247,949
kWh
|
$(-1,220.0)
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||