ITAC Assessment: KU0176
ITAC logo
ITAC Assessment: KU0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ENGINE GENERATOR ASSEMBLY
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area
n/a
Annual Production 5,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,995 404,748
kWh
Natural Gas $19,095 4,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1123: Install automatic stack damper $1,232 $1,875 - $1,232
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,562 $1,540 $1,562
24,326
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $618 $1,200 - $618
-
MMBtu
-
04 2.7314: Reduce ventilation air $227 $200 - $227
-
MMBtu
-
05 2.6214: Shut off pilots in standby equipment $203 - - $453
-
MMBtu
$(-250.0)
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $188 $60 $188
2,931
kWh
- -
TOTAL RECOMMENDED $4,030 $4,875 $1,750
27,257
kWh
$2,530
-
MMBtu
$(-250.0)
TOTAL IMPLEMENTED $1,953 $1,600 $1,750
27,257
kWh
$453
-
MMBtu
$(-250.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs