ITAC Assessment: KU0174
ITAC logo
ITAC Assessment: KU0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PNEUMATIC CONVEYOR SYSTEM
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 10,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,444 153,869
kWh
Natural Gas $4,259 952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $995 $580 $995
11,430
kWh
-
02 2.4312: Improve lubrication practices $383 $300 $383
4,396
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $153 $50 $153
1,758
kWh
-
04 2.7314: Reduce ventilation air $140 - $51
586
kWh
$89
-
MMBtu
TOTAL RECOMMENDED $1,671 $930 $1,582
18,170
kWh
$89
-
MMBtu
TOTAL IMPLEMENTED $140 - $51
586
kWh
$89
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs