Assessment Year | 1985 |
---|---|
Principal Product | ADHESIVES,HYDRAULIC OILS |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 1,800,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,101 | 759,965 |
kWh
|
$0.066 |
Natural Gas | $34,794 | 6,936 |
MMBtu
|
$5.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,023 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,997 | $11,570 |
$15,997
242,673
kWh
|
- | - | |
02 | 2.2121: Increase amount of condensate returned | $2,304 | $1,000 | - |
$2,304
-
MMBtu
|
- | |
03 | 2.2122: Install / repair insulation on condensate lines | $793 | $628 | - |
$793
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $734 | $250 |
$734
11,137
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $171 | $400 | - |
$171
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $599 | - | - |
$1,099
-
MMBtu
|
$(-500.0) | |
07 | 2.2113: Repair or replace steam traps | $427 | $400 | - |
$427
-
MMBtu
|
- | |
08 | 2.2164: Turn off steam tracing during mild weather | $442 | - | - |
$422
-
MMBtu
|
$20 | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $328 | $50 |
$328
4,982
kWh
|
- | - | |
10 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $196 | $157 | - |
$196
-
MMBtu
|
- | |
11 | 2.7261: Install timers and/or thermostats | $174 | $300 |
$174
2,638
kWh
|
- | - | |
12 | 2.4312: Improve lubrication practices | $116 | $200 |
$116
1,758
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,281 | $14,955 |
$17,349
263,188
kWh
|
$5,412
-
MMBtu
|
$(-480.0) | ||
TOTAL IMPLEMENTED | $4,023 | $1,850 |
$850
12,895
kWh
|
$3,153
-
MMBtu
|
$20 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs