Assessment Year | 1985 |
---|---|
Principal Product | COMPOSITE PAPER CANS |
NAICS |
n/a
|
SIC | 2655: Fiber Cans, Tubes, Drums, and Similar Products |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 5,936
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $259,055 | 4,499,121 |
kWh
|
$0.058 |
Natural Gas | $28,670 | 6,885 |
MMBtu
|
$4.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,109 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $19,738 | $2,752 |
$19,738
342,907
kWh
|
- | - | |
02 | 2.4312: Improve lubrication practices | $1,569 | $290 |
$1,569
27,257
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,260 | $4,000 |
$2,260
39,273
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,889 | $1,550 |
$1,889
32,825
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $759 | $1,016 |
$759
13,189
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $1,893 | $1,500 | - |
$1,893
-
MMBtu
|
- | |
07 | 2.2437: Recover waste heat from equipment | $899 | $1,480 | - |
$899
-
MMBtu
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $357 | - | - |
$757
-
MMBtu
|
$(-400.0) | |
09 | 2.1123: Install automatic stack damper | $745 | $1,100 | - |
$745
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $30,109 | $13,688 |
$26,215
455,451
kWh
|
$4,294
-
MMBtu
|
$(-400.0) | ||
TOTAL IMPLEMENTED | $10,371 | $10,936 |
$6,477
112,544
kWh
|
$4,294
-
MMBtu
|
$(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs