Assessment Year | 1985 |
---|---|
Principal Product | SAFETY EYEWEAR |
NAICS |
n/a
|
SIC | 3851: Ophthalmic Goods |
Sales Range | $1 M to 5M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 6,000,000
pieces
|
Production Hrs. Annual | 5,736
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,823 | 749,121 |
kWh
|
$0.072 |
Natural Gas | $3,125 | 634 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,416 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,816 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,200 | $890 |
$1,200
16,706
kWh
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,200 | - |
$1,200
16,706
kWh
|
- | - | |
03 | 2.4227: Use compressor air filters | $658 | $758 |
$758
10,551
kWh
|
- | $(-100.0) | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $442 | $207 |
$442
6,155
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $253 | $344 |
$253
3,517
kWh
|
- | - | |
06 | 2.4312: Improve lubrication practices | $316 | $94 |
$316
4,396
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $378 | $240 |
$442
6,155
kWh
|
$(-64.0)
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $143 | $144 |
$168
2,345
kWh
|
$(-25.0)
-
MMBtu
|
- | |
09 | 2.2511: Insulate bare equipment | $272 | $290 |
$316
4,396
kWh
|
$(-44.0)
-
MMBtu
|
- | |
10 | 2.2511: Insulate bare equipment | $214 | $66 |
$253
3,517
kWh
|
$(-39.0)
-
MMBtu
|
- | |
11 | 2.2511: Insulate bare equipment | $197 | $56 |
$232
3,224
kWh
|
$(-35.0)
-
MMBtu
|
- | |
12 | 2.2514: Cover open tanks | $143 | $280 |
$168
2,345
kWh
|
$(-25.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $5,416 | $3,369 |
$5,748
80,013
kWh
|
$(-232.0)
-
MMBtu
|
$(-100.0) | ||
TOTAL IMPLEMENTED | $3,816 | $1,949 |
$3,916
54,514
kWh
|
- | $(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs