Assessment Year | 1984 |
---|---|
Principal Product | BREADS & BAKED GOODS |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 345 |
Plant Area |
n/a
|
Annual Production | 39,000,000
lb
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,148 | 2,869,871 |
kWh
|
$0.060 |
Natural Gas | $242,181 | 57,612 |
MMBtu
|
$4.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,751 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,730 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $15,682 | $1,300 |
$15,682
259,965
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $8,014 | $6,400 |
$(-159.0)
(-2,638)
kWh
|
$8,173
-
MMBtu
|
|
03 | 2.2441: Preheat boiler makeup water with waste process heat | $3,368 | $3,000 | - |
$3,368
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,366 | - | - |
$10,366
-
MMBtu
|
|
05 | 2.1222: Install turbulators | $7,337 | $2,000 | - |
$7,337
-
MMBtu
|
|
06 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $4,922 | $3,000 | - |
$4,922
-
MMBtu
|
|
07 | 2.2414: Use waste heat from hot flue gases to preheat | $3,524 | $8,000 | - |
$3,524
-
MMBtu
|
|
08 | 2.2122: Install / repair insulation on condensate lines | $1,411 | $1,330 | - |
$1,411
-
MMBtu
|
|
09 | 2.2121: Increase amount of condensate returned | $2,264 | $2,500 | - |
$2,264
-
MMBtu
|
|
10 | 2.2114: Shut off steam traps on super heated steam lines when not in use | $5,557 | $300 | - |
$5,557
-
MMBtu
|
|
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,428 | $3,565 |
$5,428
89,977
kWh
|
- | |
13 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,710 | $960 |
$2,710
-
kWh
|
- | |
14 | 2.2437: Recover waste heat from equipment | $2,390 | $4,520 | - |
$2,390
-
MMBtu
|
|
15 | 2.4322: Use or replace with energy efficient substitutes | $495 | $500 |
$495
8,206
kWh
|
- | |
16 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $283 | $120 |
$283
4,689
kWh
|
- | |
TOTAL RECOMMENDED | $73,751 | $37,495 |
$24,439
360,199
kWh
|
$49,312
-
MMBtu
|
||
TOTAL IMPLEMENTED | $42,730 | $15,945 |
$8,916
102,872
kWh
|
$33,814
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs