ITAC Assessment: KU0128
ITAC logo
ITAC Assessment: KU0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FIBERGLASS CAMPER SHELLS
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 10,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,704 309,203
kWh
Natural Gas $23,581 4,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,271 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,864

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,484 $300 $4,484
53,927
kWh
- -
02 2.1123: Install automatic stack damper $4,147 $3,200 - $4,147
-
MMBtu
-
03 2.2532: Use only amount of air necessary to prevent explosion hazard $2,531 $178 $268
3,224
kWh
$2,263
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $2,023 $1,273 $2,023
24,326
kWh
- -
05 2.1232: Keep boiler tubes clean $942 $64 - $942
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $876 $1,200 - $876
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $268 $50 - $768
-
MMBtu
$(-500.0)
TOTAL RECOMMENDED $15,271 $6,265 $6,775
81,477
kWh
$8,996
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $11,864 $4,887 $6,507
78,253
kWh
$5,857
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs