| Assessment Year | 1984 |
|---|---|
| Principal Product | FIBERGLASS CAMPER SHELLS |
| NAICS |
n/a
|
| SIC | 3792: Travel Trailers and Campers |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $25,704 | 309,203 |
kWh
|
$0.083 |
| Natural Gas | $23,581 | 4,610 |
MMBtu
|
$5.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,271 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,864 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,484 | $300 |
$4,484
53,927
kWh
|
- | - | |
| 02 | 2.1123: Install automatic stack damper | $4,147 | $3,200 | - |
$4,147
-
MMBtu
|
- | |
| 03 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $2,531 | $178 |
$268
3,224
kWh
|
$2,263
-
MMBtu
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $2,023 | $1,273 |
$2,023
24,326
kWh
|
- | - | |
| 05 | 2.1232: Keep boiler tubes clean | $942 | $64 | - |
$942
-
MMBtu
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $876 | $1,200 | - |
$876
-
MMBtu
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $268 | $50 | - |
$768
-
MMBtu
|
$(-500.0) | |
| TOTAL RECOMMENDED | $15,271 | $6,265 |
$6,775
81,477
kWh
|
$8,996
-
MMBtu
|
$(-500.0) | ||
| TOTAL IMPLEMENTED | $11,864 | $4,887 |
$6,507
78,253
kWh
|
$5,857
-
MMBtu
|
$(-500.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs