Assessment Year | 1984 |
---|---|
Principal Product | BIOLOGICAL PRODUCTS |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
n/a
|
Annual Production | 3,650,000
lb
|
Production Hrs. Annual | 2,268
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $467,838 | 8,165,885 |
kWh
|
$0.057 |
Natural Gas | $202,809 | 40,996 |
MMBtu
|
$4.95 |
Fuel Oil #2 | $45,423 | 6,300 |
MMBtu
|
$7.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,009 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,126 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,895 | $15,000 | - |
$11,321
-
MMBtu
|
$2,574
-
MMBtu
|
|
02 | 2.1222: Install turbulators | $4,977 | $2,620 | - |
$4,054
-
MMBtu
|
$923
-
MMBtu
|
|
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,455 | $300 |
$7,455
130,129
kWh
|
- |
$(-4,000.0)
-
MMBtu
|
|
04 | 2.2113: Repair or replace steam traps | $18,415 | $4,200 | - |
$15,003
-
MMBtu
|
$3,412
-
MMBtu
|
|
05 | 2.3212: Optimize plant power factor | $6,702 | $9,600 |
$6,702
-
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $1,430 | $2,900 | - |
$1,430
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $336 | $500 |
$336
5,862
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,541 | $4,029 |
$5,541
96,717
kWh
|
- | - | |
09 | 2.2122: Install / repair insulation on condensate lines | $4,088 | $1,026 | - |
$3,331
-
MMBtu
|
$757
-
MMBtu
|
|
10 | 2.7444: Close holes and openings in building such as broken windows | $6,170 | $3,772 | - |
$5,044
-
MMBtu
|
$1,126
-
MMBtu
|
|
TOTAL RECOMMENDED | $65,009 | $43,947 |
$20,034
232,708
kWh
|
$40,183
-
MMBtu
|
$4,792
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,126 | $12,001 |
$5,541
96,717
kWh
|
$20,047
-
MMBtu
|
$4,538
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs