ITAC Assessment: KU0117
ITAC logo
ITAC Assessment: KU0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product BIOLOGICAL PRODUCTS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 3,650,000
lb
Production Hrs. Annual 2,268
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $467,838 8,165,885
kWh
Natural Gas $202,809 40,996
MMBtu
Fuel Oil #2 $45,423 6,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $13,895 $15,000 - $11,321
-
MMBtu
$2,574
-
MMBtu
02 2.1222: Install turbulators $4,977 $2,620 - $4,054
-
MMBtu
$923
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,455 $300 $7,455
130,129
kWh
- $(-4,000.0)
-
MMBtu
04 2.2113: Repair or replace steam traps $18,415 $4,200 - $15,003
-
MMBtu
$3,412
-
MMBtu
05 2.3212: Optimize plant power factor $6,702 $9,600 $6,702
-
kWh
- -
06 2.2437: Recover waste heat from equipment $1,430 $2,900 - $1,430
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $336 $500 $336
5,862
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,541 $4,029 $5,541
96,717
kWh
- -
09 2.2122: Install / repair insulation on condensate lines $4,088 $1,026 - $3,331
-
MMBtu
$757
-
MMBtu
10 2.7444: Close holes and openings in building such as broken windows $6,170 $3,772 - $5,044
-
MMBtu
$1,126
-
MMBtu
TOTAL RECOMMENDED $65,009 $43,947 $20,034
232,708
kWh
$40,183
-
MMBtu
$4,792
-
MMBtu
TOTAL IMPLEMENTED $30,126 $12,001 $5,541
96,717
kWh
$20,047
-
MMBtu
$4,538
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs