ITAC Assessment: KU0092
ITAC logo
ITAC Assessment: KU0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 13
Plant Area
n/a
Annual Production 95
ton
Production Hrs. Annual 2,340
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,322 37,222
kWh
Natural Gas $889 160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $235 $279 $235
2,638
kWh
-
02 2.6218: Turn off equipment when not in use $200 - - $200
-
MMBtu
03 2.6218: Turn off equipment when not in use $78 - $78
879
kWh
-
04 2.1231: Establish burner maintenance schedule for boilers $67 $60 - $67
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $50 - - $50
-
MMBtu
06 2.1123: Install automatic stack damper $50 $100 - $50
-
MMBtu
TOTAL RECOMMENDED $680 $439 $313
3,517
kWh
$367
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs