ITAC Assessment: KU0087
ITAC logo
ITAC Assessment: KU0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product FOOD CONTAINERS-PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 13,000
ton
Production Hrs. Annual 8,544
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $911,274 26,623,095
kWh
Natural Gas $17,689 4,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7226: Use computer programs to optimize hvac performance $6,398 $30,000 $6,398
148,300
kWh
02 2.3212: Optimize plant power factor $15,570 $15,000 $15,570
-
kWh
03 2.2611: Moderate cooling tower outlet temperature $4,858 - $4,858
126,026
kWh
04 2.2511: Insulate bare equipment $39,664 $35,000 $39,664
1,027,843
kWh
05 2.6127: Maintain air filters by cleaning or replacement $5,056 $1,680 $5,056
131,008
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,460 $2,313 $3,460
89,683
kWh
TOTAL RECOMMENDED $75,006 $83,993 $75,006
1,522,860
kWh
TOTAL IMPLEMENTED $71,546 $81,680 $71,546
1,433,177
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs