Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product DISPOSABLE MED. SUPPLIES
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $1
M
to 5
M
# of Employees 39
Plant Area
n/a
Annual Production 12,000,000
pieces
Production Hrs. Annual 2,108
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,291 199,297
kWh
Natural Gas $4,635 1,194
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $893 $923 $893
17,292
kWh
-
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $741 $147 $272
5,275
kWh
$469
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $221 $200 - $221
-
MMBtu
04 2.1123: Install automatic stack damper $171 $336 - $171
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $91 $40 $91
1,758
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $76 - $76
1,465
kWh
-
07 2.5123: Reduce fluid flow rates $77 $8 $15
293
kWh
$62
-
MMBtu
TOTAL RECOMMENDED $2,270 $1,654 $1,347
26,083
kWh
$923
-
MMBtu
TOTAL IMPLEMENTED $469 $544 $15
293
kWh
$454
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings