ITAC Assessment: KU0056
ITAC logo
ITAC Assessment: KU0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product DRY & CANNED PET FOODS
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 86,000,000
lb
Production Hrs. Annual 5,832
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,409 5,798,945
kWh
Natural Gas $288,741 75,319
MMBtu
Fuel Oil #2 $37,500 4,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7111: Reduce illumination to minimum necessary levels $10,692 $2,784 $10,692
282,532
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $17,863 $2,000 - $17,863
-
MMBtu
-
03 2.1332: Convert combustion equipment to burn natural gas $16,065 $20,000 - - $16,065
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $14,900 $450 - - $14,900
-
MMBtu
05 2.2444: Use hot process fluids to preheat incoming process fluids $10,800 $20,000 - $10,800
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $5,190 $1,724 - $5,190
-
MMBtu
-
07 2.6212: Turn off equipment during breaks, reduce operating time $4,225 $1,000 $4,225
111,665
kWh
- -
08 2.2437: Recover waste heat from equipment $3,030 $2,940 - $3,030
-
MMBtu
-
TOTAL RECOMMENDED $82,765 $50,898 $14,917
394,197
kWh
$36,883
-
MMBtu
$30,965
-
MMBtu
TOTAL IMPLEMENTED $67,865 $50,448 $14,917
394,197
kWh
$36,883
-
MMBtu
$16,065
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs