| Assessment Year | 1982 |
|---|---|
| Principal Product | DRY & CANNED PET FOODS |
| NAICS |
n/a
|
| SIC | 2047: Dog and Cat Food |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
n/a
|
| Annual Production | 86,000,000
lb
|
| Production Hrs. Annual | 5,832
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $219,409 | 5,798,945 |
kWh
|
$0.038 |
| Natural Gas | $288,741 | 75,319 |
MMBtu
|
$3.83 |
| Fuel Oil #2 | $37,500 | 4,200 |
MMBtu
|
$8.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $82,765 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $67,865 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $10,692 | $2,784 |
$10,692
282,532
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $17,863 | $2,000 | - |
$17,863
-
MMBtu
|
- | |
| 03 | 2.1332: Convert combustion equipment to burn natural gas | $16,065 | $20,000 | - | - |
$16,065
-
MMBtu
|
|
| 04 | 2.7221: Lower temperature during the winter season and vice-versa | $14,900 | $450 | - | - |
$14,900
-
MMBtu
|
|
| 05 | 2.2444: Use hot process fluids to preheat incoming process fluids | $10,800 | $20,000 | - |
$10,800
-
MMBtu
|
- | |
| 06 | 2.2136: Install / repair insulation on steam lines | $5,190 | $1,724 | - |
$5,190
-
MMBtu
|
- | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,225 | $1,000 |
$4,225
111,665
kWh
|
- | - | |
| 08 | 2.2437: Recover waste heat from equipment | $3,030 | $2,940 | - |
$3,030
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $82,765 | $50,898 |
$14,917
394,197
kWh
|
$36,883
-
MMBtu
|
$30,965
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $67,865 | $50,448 |
$14,917
394,197
kWh
|
$36,883
-
MMBtu
|
$16,065
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs