ITAC Assessment: KS2648
ITAC logo
ITAC Assessment: KS2648
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Car Plastic Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 269
Plant Area 11,000
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $965,885 9,759,904
kWh
Natural Gas $19,801 2,569
MMBtu
Waste Disposal Costs
Water Usage $7,923 1,968
Tgal
Water Disposal $11,756 1,968
Tgal
TOTAL YEARLY COSTS $1,005,365
RECOMMENDED SAVINGS* $85,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,578 $6,440 $7,578
76,542
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,308 $90 $1,308
13,207
kWh
-
03 2.2522: Isolate hot or cold equipment $4,312 $3,012 $4,312
43,556
kWh
-
04 2.8121: Apply for tax-free status for energy purchases $555 $800 - $555
05 2.9114: Use solar heat to make electricty $71,623 $722,120 $71,623
723,462
kWh
-
TOTAL RECOMMENDED $85,376 $732,462 $84,821
856,767
kWh
$555
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs