| Assessment Year | 2025 |
|---|---|
| Principal Product | Polymer Resins |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $100 M to 500M |
| # of Employees | 450 |
| Plant Area |
350,000
ft2
|
| Annual Production | 90,000,000
lb
|
| Production Hrs. Annual | 5,100
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,070,436 | 21,656,287 |
kWh
|
$0.096 | |
| Natural Gas | $350,837 | 40,155 |
MMBtu
|
$8.74 | |
| Waste Disposal Costs | |||||
| Water Usage | $23,623 | 4,226,580 |
Tgal
|
$0.006 | |
| Water Disposal | $32,516 | 4,226,580 |
Tgal
|
$0.008 | |
| TOTAL YEARLY COSTS | $2,477,412 | ||||
| RECOMMENDED SAVINGS* | $282,700 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $136,651 | $1,120,140 |
$136,651
1,422,410
kWh
|
- | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $64,473 | $494,771 |
$64,473
671,600
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,131 | $60 |
$2,131
22,198
kWh
|
- | |
| 04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $2,351 | $7,071 | - |
$2,351
-
MMBtu
|
|
| 05 | 2.1224: Replace boiler | $36,384 | $322,039 | - |
$36,384
-
MMBtu
|
|
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $40,710 | $75,751 | - |
$40,710
-
MMBtu
|
|
| TOTAL RECOMMENDED | $282,700 | $2,019,832 |
$203,255
2,116,208
kWh
|
$79,445
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs