ITAC Assessment: KS2543
ITAC logo
ITAC Assessment: KS2543
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Polymer Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 350,000
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 5,100
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,070,436 21,656,287
kWh
Natural Gas $350,837 40,155
MMBtu
Waste Disposal Costs
Water Usage $23,623 4,226,580
Tgal
Water Disposal $32,516 4,226,580
Tgal
TOTAL YEARLY COSTS $2,477,412
RECOMMENDED SAVINGS* $282,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $136,651 $1,120,140 $136,651
1,422,410
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $64,473 $494,771 $64,473
671,600
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,131 $60 $2,131
22,198
kWh
-
04 2.2449: Recover heat from exhausted steam, hot air or hot water $2,351 $7,071 - $2,351
-
MMBtu
05 2.1224: Replace boiler $36,384 $322,039 - $36,384
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $40,710 $75,751 - $40,710
-
MMBtu
TOTAL RECOMMENDED $282,700 $2,019,832 $203,255
2,116,208
kWh
$79,445
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs