ITAC Assessment: KS2430
ITAC logo
ITAC Assessment: KS2430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Corrugated Board
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 153
Plant Area 185,000
ft2
Annual Production 646,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $412,194 6,713,853
kWh
Electricity Demand $202,001 13,214
kW-mo/yr
Natural Gas $277,478 66,418
MMBtu
Waste Disposal Costs
Water Usage $31,671 4,526
Tgal
Water Disposal $48,244 4,526
Tgal
TOTAL YEARLY COSTS $971,588
RECOMMENDED SAVINGS* $173,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $53,570 $460,976 $40,437
662,902
kWh
$13,133
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,137 $60 $1,739
28,514
kWh
$1,398
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,174 $9,216 $767
12,580
kWh
$370
-
kW-mo/yr
- $1,037
04 2.2136: Install / repair insulation on steam lines $4,172 $5,121 - - $4,172
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $16,954 $60,601 - - $16,954
-
MMBtu
-
06 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $93,352 $684,000 $76,128
1,248,000
kWh
$36,720
-
kW-mo/yr
$(-13,096.0)
-
MMBtu
$(-6,400.0)
TOTAL RECOMMENDED $173,359 $1,219,974 $119,071
1,951,996
kWh
$51,621
-
kW-mo/yr
$8,030
-
MMBtu
$(-5,363.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs