| Assessment Year | 2024 |
|---|---|
| Principal Product | Metal Components Parts |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 81 |
| Plant Area |
103,000
ft2
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $182,754 | 1,660,320 |
kWh
|
$0.11 | |
| Natural Gas | $52,677 | 26,779 |
MMBtu
|
$1.97 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,748 | 492 |
Tgal
|
$5.59 | |
| Water Disposal | $1,931 | 492 |
Tgal
|
$3.92 | |
| TOTAL YEARLY COSTS | $240,110 | ||||
| RECOMMENDED SAVINGS* | $94,247 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $57,379 | $484,288 |
$57,379
521,623
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,105 | $5,480 |
$6,105
55,500
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,838 | $90 |
$1,838
16,708
kWh
|
- | |
| 04 | 2.4226: Use / purchase optimum sized compressor | $12,730 | $126,398 |
$12,730
115,731
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,984 | $26,926 |
$8,166
74,240
kWh
|
$1,818 | |
| 06 | 2.7135: Install occupancy sensors | $6,211 | $6,604 |
$5,720
52,000
kWh
|
$491 | |
| TOTAL RECOMMENDED | $94,247 | $649,786 |
$91,938
835,802
kWh
|
$2,309 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs