ITAC Assessment: KS2429
ITAC logo
ITAC Assessment: KS2429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal Components Parts
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 103,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,754 1,660,320
kWh
Natural Gas $52,677 26,779
MMBtu
Waste Disposal Costs
Water Usage $2,748 492
Tgal
Water Disposal $1,931 492
Tgal
TOTAL YEARLY COSTS $240,110
RECOMMENDED SAVINGS* $94,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $57,379 $484,288 $57,379
521,623
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,105 $5,480 $6,105
55,500
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,838 $90 $1,838
16,708
kWh
-
04 2.4226: Use / purchase optimum sized compressor $12,730 $126,398 $12,730
115,731
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,984 $26,926 $8,166
74,240
kWh
$1,818
06 2.7135: Install occupancy sensors $6,211 $6,604 $5,720
52,000
kWh
$491
TOTAL RECOMMENDED $94,247 $649,786 $91,938
835,802
kWh
$2,309
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs