ITAC Assessment: KS2425
ITAC logo
ITAC Assessment: KS2425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Adhesives and Sealants
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 32,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,784 604,700
kWh
Electricity Demand $51,446 3,934
kW-mo/yr
Waste Disposal Costs
Water Usage $2,767 444
Tgal
Water Disposal $1,432 299
Tgal
TOTAL YEARLY COSTS $104,429
RECOMMENDED SAVINGS* $50,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $297 $1,930 $203
2,500
kWh
$94
-
kW-mo/yr
-
02 2.2515: Use optimum thickness insulation $4,756 $1,620 $3,245
40,060
kWh
$1,512
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $3,253 $30,124 $2,220
27,405
kWh
$1,033
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,321 $6,963 $1,321
16,307
kWh
$615
-
kW-mo/yr
$385
05 2.9114: Use solar heat to make electricty $39,797 $360,640 $35,638
439,976
kWh
$4,159
-
kW-mo/yr
-
TOTAL RECOMMENDED $50,424 $401,277 $42,626
526,248
kWh
$7,413
-
kW-mo/yr
$385
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs