| Assessment Year | 2023 |
|---|---|
| Principal Product | Flooring Tiles and Vinyl Planks |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 110 |
| Plant Area |
168,000
ft2
|
| Annual Production | 40,000,000
units
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $408,955 | 3,998,738 |
kWh
|
$0.10 | |
| Natural Gas | $19,236 | 1,841 |
MMBtu
|
$10.45 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,933 | 272,700 |
Tgal
|
$0.007 | |
| Water Disposal | $1,795 | 272,700 |
Tgal
|
$0.007 | |
| TOTAL YEARLY COSTS | $431,919 | ||||
| RECOMMENDED SAVINGS* | $123,263 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,387 | $5,480 |
$13,387
131,242
kWh
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $491 | $60 |
$491
4,818
kWh
|
- | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,624 | - |
$8,624
84,551
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $7,983 | $18,288 |
$6,662
65,318
kWh
|
$1,321 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,242 | $12,482 |
$2,879
28,224
kWh
|
$3,363 | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $374 | $250 |
$374
3,666
kWh
|
- | |
| 07 | 2.9114: Use solar heat to make electricty | $86,162 | $716,165 |
$86,162
844,368
kWh
|
- | |
| TOTAL RECOMMENDED | $123,263 | $752,725 |
$118,579
1,162,187
kWh
|
$4,684 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs