Assessment Year | 2023 |
---|---|
Principal Product | Fabricated Metal Products |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
160,000
ft2
|
Annual Production | 1,200,000
units
|
Production Hrs. Annual | 7,140
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $127,137 | 2,686,516 |
kWh
|
$0.047 | |
Electricity Demand | $111,656 | 7,978 |
kW-mo/yr
|
$14.00 | |
Natural Gas | $7,969 | 811 |
MMBtu
|
$9.82 | |
Waste Disposal Costs | |||||
Water Usage | $6,682 | 1,239 |
Tgal
|
$5.39 | |
Water Disposal | $11,590 | 1,239 |
Tgal
|
$9.35 | |
TOTAL YEARLY COSTS | $265,034 | ||||
RECOMMENDED SAVINGS* | $137,268 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,385 | $5,960 |
$4,264
90,155
kWh
|
$2,121
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $593 | $60 |
$396
8,369
kWh
|
$197
-
kW-mo/yr
|
- | - | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $2,009 | $5,440 | - | - |
$2,009
-
MMBtu
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $307 | $119 |
$112
2,366
kWh
|
$195
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,663 | $19,796 |
$1,891
39,984
kWh
|
$941
-
kW-mo/yr
|
- | $1,831 | |
06 | 2.9114: Use solar heat to make electricty | $123,311 | $1,196,880 |
$109,507
1,871,456
kWh
|
$13,804
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $137,268 | $1,228,255 |
$116,170
2,012,330
kWh
|
$17,258
-
kW-mo/yr
|
$2,009
-
MMBtu
|
$1,831 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs