ITAC Assessment: KS2317
ITAC logo
ITAC Assessment: KS2317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Carpet Tiles
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 122,000
ft2
Annual Production 43,000,000
units
Production Hrs. Annual 5,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $438,225 4,401,886
kWh
Natural Gas $194,630 20,406
MMBtu
Waste Disposal Costs
Water Usage $36,747 13,050
Tgal
Water Disposal $52,912 13,050
Tgal
TOTAL YEARLY COSTS $722,514
RECOMMENDED SAVINGS* $80,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,385 $90 $1,385
13,849
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,229 $5,480 $3,229
32,292
kWh
- -
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $563 $411 - $563
-
MMBtu
-
04 2.1135: Repair furnaces and oven doors so that they seal efficiently $1,851 $1,638 - $1,851
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,312 $31,554 $6,048
60,480
kWh
- $2,264
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $251 $296 $251
2,507
kWh
- -
07 2.9114: Use solar heat to make electricty $65,384 $459,169 $65,384
653,837
kWh
- -
TOTAL RECOMMENDED $80,975 $498,638 $76,297
762,965
kWh
$2,414
-
MMBtu
$2,264
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs