ITAC Assessment: KG0092
ITAC logo
ITAC Assessment: KG0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive parts and accessories
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 547
Plant Area 414,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 7,752
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $903,090 17,857,269
kWh
Electricity Demand $75,336 36,710
kW-mo/yr
Electricity Fees $26,456 -
Natural Gas $15,440 2,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $186,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7229: Air condition only space necessary $23,912 $4,700 n/a $23,912
508,793
kWh
- - - -
02 2.7261: Install timers and/or thermostats $11,331 $750 n/a $11,331
241,208
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $11,307 $36,080 n/a $10,887
231,536
kWh
$420
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,310 $49,768 n/a $9,716
206,624
kWh
$594
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,741 - n/a $7,326
155,920
kWh
$415
-
kW-mo/yr
- - -
06 2.6218: Turn off equipment when not in use $5,693 - n/a $5,693
121,043
kWh
- - - -
07 2.2511: Insulate bare equipment $4,478 $519 n/a $4,478
95,252
kWh
- - - -
08 2.2611: Moderate cooling tower outlet temperature $1,889 $60 n/a $1,889
40,152
kWh
- - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $912 $3,530 n/a $912
20,223
kWh
- - - -
10 2.7292: Lower ceiling to reduce conditioned space $6,730 $2,180 n/a $6,730
143,025
kWh
- - - -
11 3.4116: Meter recycled water (to reduce sewer charges) $2,032 $800 n/a - - $2,032
-
Tgal
- -
12 3.5313: Increase amount of waste recovered for resale $6,698 - n/a - - - $6,698
-
lb
-
13 3.4151: Minimize water usage $36,279 $2,350 n/a - - $36,279
-
Tgal
- -
14 4.423: Move product using mechanical means $57,510 $1,216 n/a - - - - $57,510
TOTAL RECOMMENDED $186,822 $101,953 $82,874
1,763,776
kWh
$1,429
-
kW-mo/yr
$38,311
-
Tgal
$6,698
-
lb
$57,510
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs