ITAC Assessment: KG0083
ITAC logo
ITAC Assessment: KG0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Intensive care treatment tables
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 265
Plant Area 175,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,827 2,162,075
kWh
Electricity Demand $53,699 7,964
kW-mo/yr
Electricity Fees $1,560 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7292: Lower ceiling to reduce conditioned space $3,168 $400 n/a $3,168
99,062
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,414 $1,207 n/a $1,085
33,998
kWh
$1,329
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $544 $3,050 n/a $297
9,379
kWh
$247
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $228 $25 n/a $228
7,034
kWh
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,448 - n/a - - - $2,448
-
lb
-
06 3.1192: Reduce scrap production $40,782 - n/a - - - $40,782
-
lb
-
07 3.6192: Use a less expensive method of waste removal $300 - n/a - - $300
-
gal
- -
08 4.423: Move product using mechanical means $819 $2,275 n/a - - - - $819
09 4.423: Move product using mechanical means $1,989 $1,500 n/a - - - - $1,989
TOTAL RECOMMENDED $52,692 $8,457 $4,778
149,473
kWh
$1,576
-
kW-mo/yr
$300
-
gal
$43,230
-
lb
$2,808
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs