ITAC Assessment: KG0064
ITAC logo
ITAC Assessment: KG0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Motor Castings, Historical Markers and custom made parts.
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 2,613
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,645 3,909,144
kWh
Electricity Demand $110,348 17,725
kW-mo/yr
Electricity Fees $1,560 -
Natural Gas $30,421 9,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $5,652 $12,200 $3,849
120,750
kWh
$1,803
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,970 $3,560 $1,544
48,359
kWh
$1,426
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $846 $343 $438
13,775
kWh
$408
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $481 $20 $481
14,947
kWh
- -
05 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $1,283 $651 - - $1,283
-
Tgal
TOTAL RECOMMENDED $11,232 $16,774 $6,312
197,831
kWh
$3,637
-
kW-mo/yr
$1,283
-
Tgal
TOTAL IMPLEMENTED $6,498 $12,543 $4,287
134,525
kWh
$2,211
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs