Assessment Year | 1996 |
---|---|
Principal Product | Heating, Air conditioning and automobile controls |
NAICS |
n/a
|
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
90,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 6,128
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,859 | 3,298,945 |
kWh
|
$0.048 |
Electricity Demand | $20,230 | 10,296 |
kW-mo/yr
|
$1.96 |
Electricity Fees | $2,191 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,949 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7292: Lower ceiling to reduce conditioned space | $10,875 | $4,069 |
$10,025
211,899
kWh
|
$850
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $7,958 | $17,130 |
$7,958
168,230
kWh
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,160 | $4,878 |
$7,028
148,593
kWh
|
$1,132
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,289 | $5,200 |
$4,289
89,977
kWh
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,408 | $375 |
$2,408
50,703
kWh
|
- | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $957 | $170 |
$767
16,120
kWh
|
$190
-
kW-mo/yr
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $829 | $650 |
$726
15,240
kWh
|
$103
-
kW-mo/yr
|
- | - | - | |
08 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $2,148 | - | - | - | - |
$2,148
-
lb
|
- | |
09 | 3.8121: Cover containers to minimize evaporative losses | $16,059 | $2,850 | - | - |
$16,059
-
gal
|
- | - | |
10 | 3.5316: Contract a wood pallet recycling company | $2,200 | - | - | - | - |
$2,200
-
lb
|
- | |
11 | 3.4116: Meter recycled water (to reduce sewer charges) | $816 | $300 | - | - | - | - | $816 | |
TOTAL RECOMMENDED | $56,699 | $35,622 |
$33,201
700,762
kWh
|
$2,275
-
kW-mo/yr
|
$16,059
-
gal
|
$4,348
-
lb
|
$816 | ||
TOTAL IMPLEMENTED | $28,949 | $28,403 |
$23,176
488,863
kWh
|
$1,425
-
kW-mo/yr
|
- |
$4,348
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs