ITAC Assessment: KG0054
ITAC logo
ITAC Assessment: KG0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product 501 and 505 jeans
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $50
M
to 100
M
# of Employees 498
Plant Area 44,700
ft2
Annual Production 4,200,000
pieces
Production Hrs. Annual 4,135
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,114 3,582,356
kWh
Electricity Demand $132,145 9,774
kW-mo/yr
Electricity Fees $7,358 -
Natural Gas $4,254 790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,404 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $4,173 $9,300 $2,056
78,839
kWh
$2,117
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,511 $1,813 $3,319
127,198
kWh
$5,192
-
kW-mo/yr
-
03 2.3132: Recharge batteries on during off-peak demand periods $350 - - $350
-
kW-mo/yr
-
04 3.5311: Recover and reuse waste material $1,285 $75 - - $1,285
-
lb
05 3.5311: Recover and reuse waste material $4,085 $1,500 - - $4,085
-
lb
TOTAL RECOMMENDED $18,404 $12,688 $5,375
206,037
kWh
$7,659
-
kW-mo/yr
$5,370
-
lb
TOTAL IMPLEMENTED $12,684 $11,113 $5,375
206,037
kWh
$7,309
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs