ITAC Assessment: KG0050
ITAC logo
ITAC Assessment: KG0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product newspaper
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area 31,872
ft2
Annual Production 29,500
pieces
Production Hrs. Annual 7,644
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,697 1,123,974
kWh
Electricity Demand $47,409 3,360
kW-mo/yr
Electricity Fees $2,666 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,169

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7232: Replace existing hvac unit with high efficiency model $24,066 $29,950 $9,677
302,462
kWh
$14,389
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,491 $1,081 $1,544
48,652
kWh
$1,947
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $1,090 $930 $740
23,154
kWh
$350
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $498 $600 $293
9,086
kWh
$205
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $314 - $185
5,862
kWh
$129
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $310 $20 $181
5,569
kWh
$129
-
kW-mo/yr
-
07 3.5311: Recover and reuse waste material $6,756 - - - $6,756
-
lb
08 3.5316: Contract a wood pallet recycling company $4,072 - - - $4,072
-
lb
09 3.7212: Improved material handling (mixing and transfer) $976 - - - $976
-
lb
TOTAL RECOMMENDED $41,573 $32,581 $12,620
394,785
kWh
$17,149
-
kW-mo/yr
$11,804
-
lb
TOTAL IMPLEMENTED $40,169 $31,651 $11,695
365,769
kWh
$16,670
-
kW-mo/yr
$11,804
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs