ITAC Assessment: KG0026
ITAC logo
ITAC Assessment: KG0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Flour and tortillas,and corn taco, chalupa, and tostada shel
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 129
Plant Area 32,000
ft2
Annual Production 4,492,800
units
Production Hrs. Annual 3,432
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,725 509,965
kWh
Natural Gas $15,503 14,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2447: Heat water with exhaust heat $14,224 $2,500 $14,224
20,516
kWh
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,694 - $1,694
-
kWh
03 2.4133: Use most efficient type of electric motors $1,123 $1,850 $1,123
141,559
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,076 $183 $1,076
12,016
kWh
05 2.7261: Install timers and/or thermostats $823 $300 $823
24,619
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $605 $375 $605
7,327
kWh
07 2.4231: Reduce the pressure of compressed air to the minimum required $494 $20 $494
5,862
kWh
TOTAL RECOMMENDED $20,039 $5,228 $20,039
211,899
kWh
TOTAL IMPLEMENTED $20,039 $5,228 $20,039
211,899
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs