ITAC Assessment: KG0025
ITAC logo
ITAC Assessment: KG0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom Injection Molded Thermoplastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 65
Plant Area 97,000
ft2
Annual Production 2,600,000
lb
Production Hrs. Annual 8,592
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,540 4,293,669
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3511: Use plant owned transformers or lease transformers $28,787 $7,200 $28,787
541,325
kWh
02 2.3134: Shift from daytime to nighttime operation $21,682 - $21,682
347,304
kWh
03 2.2511: Insulate bare equipment $20,807 $284 $20,807
390,973
kWh
04 2.4133: Use most efficient type of electric motors $7,160 $6,450 $7,160
141,559
kWh
05 2.2628: Utilize a less expensive cooling method $2,950 $60 $2,950
88,218
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,632 $20 $1,632
30,774
kWh
07 2.7135: Install occupancy sensors $451 $325 $451
13,482
kWh
TOTAL RECOMMENDED $83,469 $14,339 $83,469
1,553,635
kWh
TOTAL IMPLEMENTED $58,837 $14,279 $58,837
1,118,113
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs