ITAC Assessment: IP0208
ITAC logo
ITAC Assessment: IP0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 45
Plant Area 42,080
ft2
Annual Production 39,900,000
units
Production Hrs. Annual 6,360
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,068 2,120,224
kWh
Electricity Demand $36,793 5,533
kW-mo/yr
Electricity Fees $23,245 -
Natural Gas $2,851 234
MMBtu
Waste Disposal Costs
Water Usage $2,793 137
Tgal
Water Disposal $1,446 137
Tgal
TOTAL YEARLY COSTS $264,196
RECOMMENDED SAVINGS* $51,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $3,572 - $3,572
22,050
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,420 $50 $1,878
21,096
kWh
$542
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $524 - $431
5,429
kWh
$93
-
kW-mo/yr
-
04 2.2691: Shut off cooling if cold outside air will cool process $1,666 $82 $1,666
10,281
kWh
- -
05 2.7212: Install or upgrade insulation on hvac distribution systems $1,484 $373 $1,484
9,158
kWh
- -
06 2.7135: Install occupancy sensors $705 $200 $705
7,925
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $17,254 $8,190 $15,243
94,090
kWh
$2,011
-
kW-mo/yr
-
08 2.3212: Optimize plant power factor $23,307 $34,470 - - $23,307
09 2.4221: Install compressor air intakes in coolest locations $940 $1,742 $743
8,352
kWh
$197
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,872 $45,107 $25,722
178,381
kWh
$2,843
-
kW-mo/yr
$23,307
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs