Assessment Year | 2024 |
---|---|
Principal Product | Skills based training systems manufacturing |
NAICS | 611430: Professional and Management Development Training |
SIC | 3594: Fluid Power Pumps and Motors |
Sales Range | $10 M to 50M |
# of Employees | 282 |
Plant Area |
150,000
ft2
|
Annual Production | 7,000
units
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,198 | 1,296,561 |
kWh
|
$0.064 |
Electricity Demand | $53,078 | 6,989 |
kW-mo/yr
|
$7.59 |
Electricity Fees | $9,539 | - |
|
- |
Natural Gas | $16,000 | 1,616 |
MMBtu
|
$9.90 |
TOTAL YEARLY COSTS | $161,815 | |||
RECOMMENDED SAVINGS* | $33,262 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,703 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,258 | - |
$1,258
19,656
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,158 | $32 |
$996
15,562
kWh
|
$162
-
kW-mo/yr
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $8,666 | $1,830 |
$256
4,000
kWh
|
$8,410
-
kW-mo/yr
|
|
04 | 3.1223: Use fog nozzles / spray rinsing instead of immersion rinsing | $4,518 | $5,490 |
$4,518
70,598
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,597 | $3,719 |
$931
14,540
kWh
|
$666
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,621 | $36,055 |
$5,826
91,034
kWh
|
$3,795
-
kW-mo/yr
|
|
07 | 2.7425: Clean or color roof to reduce solar load | $6,444 | $26,075 |
$5,543
86,615
kWh
|
$901
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $33,262 | $73,201 |
$19,328
302,005
kWh
|
$13,934
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $20,703 | $37,917 |
$8,336
130,252
kWh
|
$12,367
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs