ITAC Assessment: IP0180
ITAC logo
ITAC Assessment: IP0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Skills based training systems manufacturing
NAICS 611430: Professional and Management Development Training
SIC 3594: Fluid Power Pumps and Motors
Sales Range $10
M
to 50
M
# of Employees 282
Plant Area 150,000
ft2
Annual Production 7,000
units
Production Hrs. Annual 2,184
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,198 1,296,561
kWh
Electricity Demand $53,078 6,989
kW-mo/yr
Electricity Fees $9,539 -
Natural Gas $16,000 1,616
MMBtu
TOTAL YEARLY COSTS $161,815
RECOMMENDED SAVINGS* $33,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,258 - $1,258
19,656
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,158 $32 $996
15,562
kWh
$162
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $8,666 $1,830 $256
4,000
kWh
$8,410
-
kW-mo/yr
04 3.1223: Use fog nozzles / spray rinsing instead of immersion rinsing $4,518 $5,490 $4,518
70,598
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,597 $3,719 $931
14,540
kWh
$666
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,621 $36,055 $5,826
91,034
kWh
$3,795
-
kW-mo/yr
07 2.7425: Clean or color roof to reduce solar load $6,444 $26,075 $5,543
86,615
kWh
$901
-
kW-mo/yr
TOTAL RECOMMENDED $33,262 $73,201 $19,328
302,005
kWh
$13,934
-
kW-mo/yr
TOTAL IMPLEMENTED $20,703 $37,917 $8,336
130,252
kWh
$12,367
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs