| Assessment Year | 2024 |
|---|---|
| Principal Product | Recycled copper |
| NAICS | 335929: Other Communication and Energy Wire Manufacturing |
| SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
44,000
ft2
|
| Annual Production | 25,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $351,699 | 2,934,000 |
kWh
|
$0.12 | |
| Electricity Fees | $2,130 | - |
|
- | |
| Natural Gas | $25,388 | 2,604 |
MMBtu
|
$9.75 | |
| Waste Disposal Costs | |||||
| Water Usage | $7,331 | 51,700 |
Tgal
|
$0.14 | |
| TOTAL YEARLY COSTS | $386,548 | ||||
| RECOMMENDED SAVINGS* | $52,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6211: Conserve energy by efficient use of vending machines | $471 | - |
$471
3,925
kWh
|
- | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $3,855 | - |
$121
1,009
kWh
|
$3,734
-
MMBtu
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $19,788 | $345 |
$19,788
164,900
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $814 | $9 |
$814
6,780
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,534 | $182 |
$1,534
12,780
kWh
|
- | |
| 06 | 2.7234: Use heat pump for space conditioning | $26,133 | $46,106 |
$744
6,201
kWh
|
$25,389
-
MMBtu
|
|
| 07 | 2.7492: Use proper thickness of insulation on building envelope | $378 | $3,830 | - |
$378
-
MMBtu
|
|
| TOTAL RECOMMENDED | $52,973 | $50,472 |
$23,472
195,595
kWh
|
$29,501
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs