ITAC Assessment: IP0179
ITAC logo
ITAC Assessment: IP0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Recycled copper
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 44,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,699 2,934,000
kWh
Electricity Fees $2,130 -
Natural Gas $25,388 2,604
MMBtu
Waste Disposal Costs
Water Usage $7,331 51,700
Tgal
TOTAL YEARLY COSTS $386,548
RECOMMENDED SAVINGS* $52,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6211: Conserve energy by efficient use of vending machines $471 - $471
3,925
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $3,855 - $121
1,009
kWh
$3,734
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $19,788 $345 $19,788
164,900
kWh
-
04 2.7135: Install occupancy sensors $814 $9 $814
6,780
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,534 $182 $1,534
12,780
kWh
-
06 2.7234: Use heat pump for space conditioning $26,133 $46,106 $744
6,201
kWh
$25,389
-
MMBtu
07 2.7492: Use proper thickness of insulation on building envelope $378 $3,830 - $378
-
MMBtu
TOTAL RECOMMENDED $52,973 $50,472 $23,472
195,595
kWh
$29,501
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs