ITAC Assessment: IP0175
ITAC logo
ITAC Assessment: IP0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wastewater treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 150,000
ft2
Annual Production 27,850,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,132,904 15,194,400
kWh
Electricity Fees $1,621 -
Natural Gas $97,846 14,410
MMBtu
TOTAL YEARLY COSTS $1,232,371
RECOMMENDED SAVINGS* $53,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2211: Use optimum temperature $452 - $252
3,363
kWh
$200
-
MMBtu
02 2.3212: Optimize plant power factor $30,222 $6,500 $30,222
402,960
kWh
-
03 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $22,456 $24,300 $2,136
28,488
kWh
$20,320
-
MMBtu
TOTAL RECOMMENDED $53,130 $30,800 $32,610
434,811
kWh
$20,520
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs