ITAC Assessment: IP0167
ITAC logo
ITAC Assessment: IP0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Automotive Fuel & Air Management Systems
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 391
Plant Area 412,803
ft2
Annual Production 6,100,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,367,324 32,883,200
kWh
Electricity Demand $1,500,242 127,471
kW-mo/yr
Electricity Fees $14,335 -
Natural Gas $547,549 211,698
MMBtu
Waste Disposal Costs
Water Usage $48,088 16,021
Tgal
Water Disposal $68,638 7,364
Tgal
TOTAL YEARLY COSTS $3,546,176
RECOMMENDED SAVINGS* $89,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,613

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $17,520 $2,500 - - - $17,520
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $33,801 $3,457 $32,535
774,648
kWh
$1,266
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,573 $475 $1,754
41,760
kWh
$819
-
kW-mo/yr
- -
04 2.7229: Air condition only space necessary $6,333 $2,520 $253
6,013
kWh
- - $6,080
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,306 $3,300 $3,306
78,714
kWh
- - -
06 2.2437: Recover waste heat from equipment $1,236 $2,330 $1,236
30,571
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $369 $730 $369
8,786
kWh
- - -
08 2.7231: Use radiant heater for spot heating $10,286 $21,879 - - - $10,286
-
MMBtu
09 2.3212: Optimize plant power factor $11,341 $26,639 - - $11,341 -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,565 $8,140 $2,565
61,071
kWh
- - -
TOTAL RECOMMENDED $89,330 $71,970 $42,018
1,001,563
kWh
$2,085
-
kW-mo/yr
$11,341 $33,886
-
MMBtu
TOTAL IMPLEMENTED $56,613 $41,231 $37,107
883,492
kWh
$2,085
-
kW-mo/yr
$11,341 $6,080
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs