Assessment Year | 2023 |
---|---|
Principal Product | Automotive Fuel & Air Management Systems |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 391 |
Plant Area |
412,803
ft2
|
Annual Production | 6,100,000
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,367,324 | 32,883,200 |
kWh
|
$0.042 | |
Electricity Demand | $1,500,242 | 127,471 |
kW-mo/yr
|
$11.77 | |
Electricity Fees | $14,335 | - |
|
- | |
Natural Gas | $547,549 | 211,698 |
MMBtu
|
$2.59 | |
Waste Disposal Costs | |||||
Water Usage | $48,088 | 16,021 |
Tgal
|
$3.00 | |
Water Disposal | $68,638 | 7,364 |
Tgal
|
$9.32 | |
TOTAL YEARLY COSTS | $3,546,176 | ||||
RECOMMENDED SAVINGS* | $89,330 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $56,613 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $17,520 | $2,500 | - | - | - |
$17,520
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,801 | $3,457 |
$32,535
774,648
kWh
|
$1,266
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,573 | $475 |
$1,754
41,760
kWh
|
$819
-
kW-mo/yr
|
- | - | |
04 | 2.7229: Air condition only space necessary | $6,333 | $2,520 |
$253
6,013
kWh
|
- | - |
$6,080
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,306 | $3,300 |
$3,306
78,714
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $1,236 | $2,330 |
$1,236
30,571
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $369 | $730 |
$369
8,786
kWh
|
- | - | - | |
08 | 2.7231: Use radiant heater for spot heating | $10,286 | $21,879 | - | - | - |
$10,286
-
MMBtu
|
|
09 | 2.3212: Optimize plant power factor | $11,341 | $26,639 | - | - | $11,341 | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,565 | $8,140 |
$2,565
61,071
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $89,330 | $71,970 |
$42,018
1,001,563
kWh
|
$2,085
-
kW-mo/yr
|
$11,341 |
$33,886
-
MMBtu
|
||
TOTAL IMPLEMENTED | $56,613 | $41,231 |
$37,107
883,492
kWh
|
$2,085
-
kW-mo/yr
|
$11,341 |
$6,080
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs