ITAC Assessment: IP0137
ITAC logo
ITAC Assessment: IP0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Auto Components
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $100
M
to 500
M
# of Employees 950
Plant Area 1,000,000
ft2
Annual Production 66,255,116
units
Production Hrs. Annual 4,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,736,094 58,743,772
kWh
Electricity Demand $2,271,482 130,325
kW-mo/yr
Electricity Fees $(-102,786.0) -
Natural Gas $513,510 116,449
MMBtu
Waste Disposal Costs
Water Usage $109,554 34,531
Tgal
TOTAL YEARLY COSTS $5,527,854
RECOMMENDED SAVINGS* $90,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $2,249 - $1,482
31,799
kWh
$767
-
kW-mo/yr
-
02 2.4322: Use or replace with energy efficient substitutes $609 - $400
8,585
kWh
$209
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $64,260 $1,554 $49,447
1,061,094
kWh
- $14,813
-
MMBtu
04 2.2437: Recover waste heat from equipment $6,117 $2,100 - - $6,117
-
MMBtu
05 2.7134: Use photocell controls $184 $138 $184
3,942
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $789 $1,348 $388
8,316
kWh
$401
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,777 $4,138 $1,062
22,792
kWh
$715
-
kW-mo/yr
-
08 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $14,497 $39,760 $7,176
154,000
kWh
$7,321
-
kW-mo/yr
-
TOTAL RECOMMENDED $90,482 $49,038 $60,139
1,290,528
kWh
$9,413
-
kW-mo/yr
$20,930
-
MMBtu
TOTAL IMPLEMENTED $11,541 $7,586 $3,332
71,492
kWh
$2,092
-
kW-mo/yr
$6,117
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings