Assessment Year | 2019 |
---|---|
Principal Product | Hydraulic Valves |
NAICS | 332721: Precision Turned Product Manufacturing |
SIC | 3451: Screw Machine Products |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
150,000
ft2
|
Annual Production | 2,125,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $580,777 | 6,091,081 |
kWh
|
$0.095 |
Electricity Fees | $2,343 | - |
|
- |
Natural Gas | $40,305 | 11,133 |
MMBtu
|
$3.62 |
TOTAL YEARLY COSTS | $623,425 | |||
RECOMMENDED SAVINGS* | $175,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $2,178 | - |
$2,178
22,688
kWh
|
- | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,715 | $30 |
$300
3,128
kWh
|
$1,415
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,511 | $70 |
$2,511
26,159
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,687 | $2,825 |
$6,687
69,658
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $13,877 | $9,532 |
$13,877
144,554
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,631 | $46,979 |
$17,631
183,655
kWh
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $130,871 | $597,520 |
$149,520
1,557,504
kWh
|
$(-18,649.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $175,470 | $656,956 |
$192,704
2,007,346
kWh
|
$(-17,234.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,198 | $2,895 |
$9,198
95,817
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs