Assessment Year 2019
Principal Product Hydraulic Valves
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 150,000
ft2
Annual Production 2,125,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $580,777 6,091,081
kWh
Electricity Fees $2,343 -
Natural Gas $40,305 11,133
MMBtu
TOTAL YEARLY COSTS $623,425
RECOMMENDED SAVINGS* $175,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $2,178 - $2,178
22,688
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $1,715 $30 $300
3,128
kWh
$1,415
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,511 $70 $2,511
26,159
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,687 $2,825 $6,687
69,658
kWh
-
05 2.7135: Install occupancy sensors $13,877 $9,532 $13,877
144,554
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $17,631 $46,979 $17,631
183,655
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $130,871 $597,520 $149,520
1,557,504
kWh
$(-18,649.0)
-
MMBtu
TOTAL RECOMMENDED $175,470 $656,956 $192,704
2,007,346
kWh
$(-17,234.0)
-
MMBtu
TOTAL IMPLEMENTED $9,198 $2,895 $9,198
95,817
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs