Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Furnace Equipment
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 125,200
ft2
Annual Production 720
units
Production Hrs. Annual 6,396
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,617 825,700
kWh
Electricity Demand $61,156 3,267
kW-mo/yr
Electricity Fees $7,665 -
Natural Gas $44,727 7,705
MMBtu
TOTAL YEARLY COSTS $158,165
RECOMMENDED SAVINGS* $18,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7221: Lower temperature during the winter season and vice-versa $702 - $702
12,982
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,930 $54 $1,930
35,710
kWh
- -
03 2.3212: Optimize plant power factor $9,556 $3,958 - - $9,556
04 2.4231: Reduce the pressure of compressed air to the minimum required $162 $63 $140
2,587
kWh
$22
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,297 $22,990 $5,960
110,296
kWh
$337
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,647 $27,065 $8,732
161,575
kWh
$359
-
kW-mo/yr
$9,556
TOTAL IMPLEMENTED $8,227 $23,044 $7,890
146,006
kWh
$337
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs