ITAC Assessment: IP0106
ITAC logo
ITAC Assessment: IP0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product fiberglass backing
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 93
Plant Area 468,000
ft2
Annual Production 97,734,287
units
Production Hrs. Annual 8,616
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,300,701 28,800,595
kWh
Electricity Demand $90,049 44,585
kW-mo/yr
Electricity Fees $117,692 -
Natural Gas $1,973,929 598,559
MMBtu
TOTAL YEARLY COSTS $3,482,371
RECOMMENDED SAVINGS* $12,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $4,724 - $2,414
53,644
kWh
- $2,310
-
MMBtu
02 2.7135: Install occupancy sensors $548 $1,325 $548
12,187
kWh
- -
03 2.2437: Recover waste heat from equipment $2,543 $9,687 $(-549.6)
(-12,212)
kWh
$(-37.8)
-
kW-mo/yr
$3,130
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,159 $21,897 $4,595
102,119
kWh
$564
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,974 $32,909 $7,008
155,738
kWh
$526
-
kW-mo/yr
$5,440
-
MMBtu
TOTAL IMPLEMENTED $5,707 $23,222 $5,143
114,306
kWh
$564
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs