| Assessment Year | 2018 |
|---|---|
| Principal Product | Bearings |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 266 |
| Plant Area |
165,882
ft2
|
| Annual Production | 19,614,202
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $564,833 | 18,421,665 |
kWh
|
$0.031 |
| Electricity Demand | $836,634 | 33,371 |
kW-mo/yr
|
$25.07 |
| Electricity Fees | $(-6,123.0) | - |
|
- |
| Natural Gas | $69,579 | 12,376 |
MMBtu
|
$5.62 |
| TOTAL YEARLY COSTS | $1,464,923 | |||
| RECOMMENDED SAVINGS* | $24,557 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $6,210 | - |
$4,383
142,961
kWh
|
- |
$1,827
-
MMBtu
|
|
| 02 | 2.4322: Use or replace with energy efficient substitutes | $136 | - |
$64
2,080
kWh
|
$72
-
kW-mo/yr
|
- | |
| 03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $10 | - |
$10
311
kWh
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $759 | $629 |
$759
24,766
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,705 | $10,744 |
$5,705
186,080
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,737 | $35,615 |
$5,535
180,544
kWh
|
$6,202
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $24,557 | $46,988 |
$16,456
536,742
kWh
|
$6,274
-
kW-mo/yr
|
$1,827
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs