Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Bearings
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 266
Plant Area 165,882
ft2
Annual Production 19,614,202
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $564,833 18,421,665
kWh
Electricity Demand $836,634 33,371
kW-mo/yr
Electricity Fees $(-6,123.0) -
Natural Gas $69,579 12,376
MMBtu
TOTAL YEARLY COSTS $1,464,923
RECOMMENDED SAVINGS* $24,557 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $6,210 - $4,383
142,961
kWh
- $1,827
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $136 - $64
2,080
kWh
$72
-
kW-mo/yr
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $10 - $10
311
kWh
- -
04 2.7135: Install occupancy sensors $759 $629 $759
24,766
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,705 $10,744 $5,705
186,080
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,737 $35,615 $5,535
180,544
kWh
$6,202
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,557 $46,988 $16,456
536,742
kWh
$6,274
-
kW-mo/yr
$1,827
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs