Assessment Year | 2017 |
---|---|
Principal Product | Precision Metal Parts, Heavy Diesel Engines |
NAICS | 331221: Rolled Steel Shape Manufacturing |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
119,000
ft2
|
Annual Production | 1,017,922
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $259,021 | 5,242,400 |
kWh
|
$0.049 | |
Electricity Demand | $208,807 | 12,989 |
kW-mo/yr
|
$16.08 | |
Electricity Fees | $37,186 | - |
|
- | |
Natural Gas | $28,543 | 5,048 |
MMBtu
|
$5.65 | |
Waste Disposal Costs | |||||
Water Usage | $9,611 | 2,190,144 |
Tgal
|
$0.004 | |
Water Disposal | $16,661 | 4,030 |
Tgal
|
$4.13 | |
TOTAL YEARLY COSTS | $559,829 | ||||
RECOMMENDED SAVINGS* | $112,518 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $17,546 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $3,463 | - |
$2,245
45,540
kWh
|
$1,218
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,932 | $4 |
$7,735
156,884
kWh
|
$4,197
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,016 | $90 |
$4,548
92,257
kWh
|
$2,468
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $137 | $8 |
$89
1,800
kWh
|
$48
-
kW-mo/yr
|
- | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $12,071 | $775 |
$12,071
244,863
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,677 | $1,400 |
$3,680
74,664
kWh
|
$1,997
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,028 | $7,975 |
$18,820
381,744
kWh
|
$10,208
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $522 | $204 |
$522
10,591
kWh
|
- | - | |
09 | 2.4322: Use or replace with energy efficient substitutes | $2,994 | $1,740 |
$2,994
60,732
kWh
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $155 | $109 |
$155
3,154
kWh
|
- | - | |
11 | 2.3212: Optimize plant power factor | $23,517 | $28,545 | - | - | $23,517 | |
12 | 2.7241: Install outside air damper / economizer on hvac unit | $2,582 | $3,703 |
$2,582
52,389
kWh
|
- | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,424 | $31,458 |
$8,593
174,302
kWh
|
$4,831
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $112,518 | $76,010 |
$64,034
1,298,920
kWh
|
$24,967
-
kW-mo/yr
|
$23,517 | ||
TOTAL IMPLEMENTED | $17,546 | $31,670 |
$11,449
232,233
kWh
|
$6,097
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs