ITAC Assessment: IP0073
ITAC logo
ITAC Assessment: IP0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Forklift components
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 40,000
ft2
Annual Production 303,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,290 1,566,109
kWh
Electricity Demand $26,003 3,787
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $11,902 1,584
MMBtu
TOTAL YEARLY COSTS $163,395
RECOMMENDED SAVINGS* $15,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,406 $6 $1,205
15,188
kWh
$201
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $843 $23 $723
9,120
kWh
$120
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $6,568 $227 $6,568
82,756
kWh
-
04 2.7135: Install occupancy sensors $3,721 $476 $3,721
46,884
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,432 $3,249 $2,942
37,066
kWh
$490
-
kW-mo/yr
TOTAL RECOMMENDED $15,970 $3,981 $15,159
191,014
kWh
$811
-
kW-mo/yr
TOTAL IMPLEMENTED $15,970 $3,981 $15,159
191,014
kWh
$811
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs