Assessment Year | 2016 |
---|---|
Principal Product | Forklift components |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 64 |
Plant Area |
40,000
ft2
|
Annual Production | 303,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,290 | 1,566,109 |
kWh
|
$0.079 |
Electricity Demand | $26,003 | 3,787 |
kW-mo/yr
|
$6.87 |
Electricity Fees | $1,200 | - |
|
- |
Natural Gas | $11,902 | 1,584 |
MMBtu
|
$7.51 |
TOTAL YEARLY COSTS | $163,395 | |||
RECOMMENDED SAVINGS* | $15,970 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,406 | $6 |
$1,205
15,188
kWh
|
$201
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $843 | $23 |
$723
9,120
kWh
|
$120
-
kW-mo/yr
|
|
03 | 2.4322: Use or replace with energy efficient substitutes | $6,568 | $227 |
$6,568
82,756
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $3,721 | $476 |
$3,721
46,884
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,432 | $3,249 |
$2,942
37,066
kWh
|
$490
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $15,970 | $3,981 |
$15,159
191,014
kWh
|
$811
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $15,970 | $3,981 |
$15,159
191,014
kWh
|
$811
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs