ITAC Assessment: IP0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Corrugted Packaging
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 106,000
ft2
Annual Production 203,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,287 1,295,950
kWh
Electricity Demand $40,829 3,870
kW-mo/yr
Electricity Fees $953 -
Natural Gas $12,143 2,219
MMBtu
Waste Disposal Costs
Water Usage $6,367 614,151
Tgal
TOTAL YEARLY COSTS $136,579
RECOMMENDED SAVINGS* $17,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4323: Use optimum size and capacity equipment $575 - $423
7,200
kWh
$152
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $8,543 $74 $8,481
144,227
kWh
$62
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,137 $40 $2,075
35,293
kWh
$62
-
kW-mo/yr
04 2.7135: Install occupancy sensors $996 $113 $996
16,932
kWh
-
05 2.7241: Install outside air damper / economizer on hvac unit $492 $720 $492
8,372
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,285 $9,938 $2,586
43,980
kWh
$1,699
-
kW-mo/yr
TOTAL RECOMMENDED $17,028 $10,885 $15,053
256,004
kWh
$1,975
-
kW-mo/yr
TOTAL IMPLEMENTED $11,676 $227 $11,552
196,452
kWh
$124
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs