Assessment Year | 2016 |
---|---|
Principal Product | Corrugted Packaging |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
106,000
ft2
|
Annual Production | 203,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $76,287 | 1,295,950 |
kWh
|
$0.059 | |
Electricity Demand | $40,829 | 3,870 |
kW-mo/yr
|
$10.55 | |
Electricity Fees | $953 | - |
|
- | |
Natural Gas | $12,143 | 2,219 |
MMBtu
|
$5.47 | |
Waste Disposal Costs | |||||
Water Usage | $6,367 | 614,151 |
Tgal
|
$0.010 | |
TOTAL YEARLY COSTS | $136,579 | ||||
RECOMMENDED SAVINGS* | $17,028 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,676 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $575 | - |
$423
7,200
kWh
|
$152
-
kW-mo/yr
|
|
02 | 2.4322: Use or replace with energy efficient substitutes | $8,543 | $74 |
$8,481
144,227
kWh
|
$62
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,137 | $40 |
$2,075
35,293
kWh
|
$62
-
kW-mo/yr
|
|
04 | 2.7135: Install occupancy sensors | $996 | $113 |
$996
16,932
kWh
|
- | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $492 | $720 |
$492
8,372
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,285 | $9,938 |
$2,586
43,980
kWh
|
$1,699
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $17,028 | $10,885 |
$15,053
256,004
kWh
|
$1,975
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $11,676 | $227 |
$11,552
196,452
kWh
|
$124
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs