| Assessment Year | 2014 |
|---|---|
| Principal Product | Aluminum Die Casting |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $100 M to 500M |
| # of Employees | 950 |
| Plant Area |
41,380,000
ft2
|
| Annual Production | 7,500,000
pieces
|
| Production Hrs. Annual | 5,100
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,287,720 | 63,853,846 |
kWh
|
$0.036 |
| Electricity Demand | $1,893,603 | 123,667 |
kW-mo/yr
|
$15.31 |
| Electricity Fees | $900 | - |
|
- |
| Natural Gas | $312,228 | 73,649 |
MMBtu
|
$4.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,759,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,982 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.4111: Use closed cycle process to minimize waste water production | $5,065,497 | $375,000 | - | - |
$5,065,497
-
Tgal
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,715 | $14,486 |
$12,452
279,326
kWh
|
$10,263
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,679 | $59,914 |
$2,252
134,051
kWh
|
$5,427
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,588 | $22,450 |
$872
51,898
kWh
|
$1,716
-
kW-mo/yr
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $1,661,000 | $17,500,000 |
$1,661,000
37,270,800
kWh
|
- | - | |
| TOTAL RECOMMENDED | $6,759,479 | $17,971,850 |
$1,676,576
37,736,075
kWh
|
$17,406
-
kW-mo/yr
|
$5,065,497
-
Tgal
|
||
| TOTAL IMPLEMENTED | $32,982 | $96,850 |
$15,576
465,275
kWh
|
$17,406
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs