ITAC Assessment: IP0025
ITAC logo
ITAC Assessment: IP0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Fans
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 60,759
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,770 3,135,502
kWh
Electricity Demand $110,680 7,872
kW-mo/yr
Electricity Fees $134,308 -
Natural Gas $48,987 8,267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,805 - - $6,805
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $8,161 - - - $8,161 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $471 - $226
5,741
kWh
$245
-
kW-mo/yr
- -
04 2.7221: Lower temperature during the winter season and vice-versa $4,545 - $1,366
34,756
kWh
- - $3,179
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,759 $60 $4,759
121,095
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,468 - $377
9,587
kWh
$1,091
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $2,123 $1,770 - - - $2,123
-
MMBtu
08 2.7135: Install occupancy sensors $2,944 $3,961 $2,944
74,905
kWh
- - -
TOTAL RECOMMENDED $31,276 $5,791 $9,672
246,084
kWh
$8,141
-
kW-mo/yr
$8,161 $5,302
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs