ITAC Assessment: IP0005
ITAC logo
ITAC Assessment: IP0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Engine Cooling Assemblies and Water Pump Assemblies
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 270
Plant Area 170,000
ft2
Annual Production 34,000,000
pieces
Production Hrs. Annual 6,912
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $682,736 10,125,900
kWh
Electricity Demand $134,018 21,015
kW-mo/yr
Electricity Fees $1,470 -
Natural Gas $60,898 7,028
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,223

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $33,112 - $33,112
605,349
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,540 - $12,540
229,374
kWh
-
03 2.2511: Insulate bare equipment $683 - $683
12,499
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $997 $1,803 $816
14,930
kWh
$181
-
kW-mo/yr
05 2.4131: Size electric motors for peak operating efficiency $16,542 $37,000 $16,542
302,585
kWh
-
TOTAL RECOMMENDED $63,874 $38,803 $63,693
1,164,737
kWh
$181
-
kW-mo/yr
TOTAL IMPLEMENTED $13,223 - $13,223
241,873
kWh
-