ITAC Assessment: IC0350
ITAC logo
ITAC Assessment: IC0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 100
Plant Area 50,243
ft2
Annual Production 1
units
Production Hrs. Annual 2,860
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,783 440,928
kWh
Electricity Demand $19,273 1,545
kW-mo/yr
Electricity Fees $5,191 -
Natural Gas $2,564 857
MMBtu
Other Energy $1,035 1
MMBtu
TOTAL YEARLY COSTS $71,846
RECOMMENDED SAVINGS* $36,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7221: Lower temperature during the winter season and vice-versa $11,793 - $11,347
113,467
kWh
$446
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,208 $18,739 $4,272
42,725
kWh
$1,182
-
kW-mo/yr
$(-273.4)
-
MMBtu
$2,027
03 2.7135: Install occupancy sensors $2,178 $8,225 $1,032
10,323
kWh
$1,145
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,604 $17,739 $9,868
98,680
kWh
$2,086
-
kW-mo/yr
- $(-350.0)
05 2.2625: Chill water to the highest temperature possible $3,509 - $2,889
28,886
kWh
$620
-
kW-mo/yr
- -
06 2.6226: Optimize filtration cleaning / replacement to minimize air resistance $539 $74 $234
2,340
kWh
$306
-
kW-mo/yr
- -
TOTAL RECOMMENDED $36,831 $44,777 $29,642
296,421
kWh
$5,785
-
kW-mo/yr
$(-273.4)
-
MMBtu
$1,677
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs