ITAC Assessment: IC0323
ITAC logo
ITAC Assessment: IC0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 100
Plant Area 54,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,821 382,400
kWh
Electricity Demand $12,463 967
kW-mo/yr
Electricity Fees $15,154 -
Natural Gas $21,948 3,807
MMBtu
TOTAL YEARLY COSTS $69,386
RECOMMENDED SAVINGS* $60,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $47,182 $233,599 $19,646
377,800
kWh
$27,536
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $549 $2,512 $341
6,558
kWh
- $208
-
MMBtu
03 2.2511: Insulate bare equipment $984 $6,680 - - $984
-
MMBtu
04 2.7135: Install occupancy sensors $6,567 $6,783 $2,024
38,919
kWh
$4,543
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $497 $1,045 $219
4,212
kWh
$278
-
kW-mo/yr
-
06 2.1224: Replace boiler $5,000 $39,055 - - $5,000
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $130 $288 $10
191
kWh
$120
-
kW-mo/yr
-
TOTAL RECOMMENDED $60,908 $289,962 $22,239
427,680
kWh
$32,477
-
kW-mo/yr
$6,191
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs