ITAC Assessment: IC0304
ITAC logo
ITAC Assessment: IC0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fruit Juices
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 140
Plant Area 155,300
ft2
Annual Production 3,997,011
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $565,178 9,567,939
kWh
Electricity Demand $175,934 17,350
kW-mo/yr
Electricity Fees $285,204 -
Natural Gas $109,397 15,676
MMBtu
Waste Disposal Costs
Water Usage $279,952 58,214,000
Tgal
Other Liquid (non-haz) $106,652 22,549,000,000
gal
TOTAL YEARLY COSTS $1,522,317
RECOMMENDED SAVINGS* $436,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,108 - $10,610
179,834
kWh
$2,498
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $577 $976 $471
7,990
kWh
$105
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $335,865 $2,216,227 $165,382
2,803,084
kWh
$170,483
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $5,880 $3,863 $4,759
80,658
kWh
$1,121
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,066 $4,623 $21,531
364,935
kWh
$2,535
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $6,094 $4,720 $4,888
82,844
kWh
$1,207
-
kW-mo/yr
-
07 2.3132: Recharge batteries on during off-peak demand periods $5,023 - - $5,023
-
kW-mo/yr
-
08 2.4239: Eliminate or reduce compressed air usage $13,654 $250 $86
1,465
kWh
$13,567
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $32,173 $3,405 $15,412
261,223
kWh
$13,435
-
kW-mo/yr
$3,326
-
MMBtu
TOTAL RECOMMENDED $436,440 $2,234,064 $223,140
3,782,033
kWh
$209,974
-
kW-mo/yr
$3,326
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs