ITAC Assessment: IC0295
ITAC logo
ITAC Assessment: IC0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal Cans Ends
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 178
Plant Area 146,896
ft2
Annual Production 17,200,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $962,938 21,559,824
kWh
Electricity Demand $888,009 33,356
kW-mo/yr
Electricity Fees $512,235 -
Natural Gas $54,932 6,173
MMBtu
TOTAL YEARLY COSTS $2,418,114
RECOMMENDED SAVINGS* $66,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,278

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,690 $3,413 $3,143
69,854
kWh
$2,547
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $8,497 $558 $2,885
64,130
kWh
$5,612
-
kW-mo/yr
-
03 2.3132: Recharge batteries on during off-peak demand periods $13,248 - - $13,248
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,828 $7,539 $5,981
132,914
kWh
$4,847
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,221 $6,343 $6,198
137,736
kWh
$5,023
-
kW-mo/yr
-
06 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $16,247 $16,893 $820
18,215
kWh
- $15,427
-
MMBtu
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $843 $490 $843
18,739
kWh
- -
TOTAL RECOMMENDED $66,574 $35,235 $19,870
441,589
kWh
$31,276
-
kW-mo/yr
$15,427
-
MMBtu
TOTAL IMPLEMENTED $28,278 $4,460 $6,872
152,723
kWh
$21,407
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs