ITAC Assessment: IC0289
ITAC logo
ITAC Assessment: IC0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 187
Plant Area 79,838
ft2
Annual Production 1
units
Production Hrs. Annual 2,625
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,299 849,398
kWh
Electricity Demand $28,377 2,211
kW-mo/yr
Electricity Fees $11,761 -
Natural Gas $12,543 1,513
MMBtu
TOTAL YEARLY COSTS $130,980
RECOMMENDED SAVINGS* $104,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,464

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,395 $19,066 $16,757
182,145
kWh
$10,637
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $9,069 $7,303 $8,291
90,125
kWh
$778
-
kW-mo/yr
-
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,672 - $2,148
23,872
kWh
- $1,524
-
MMBtu
04 2.9114: Use solar heat to make electricty $43,347 $366,628 $36,419
395,854
kWh
$6,928
-
kW-mo/yr
-
05 2.7234: Use heat pump for space conditioning $21,396 $151,345 $23,966
260,495
kWh
$(-2,569.6)
-
kW-mo/yr
-
TOTAL RECOMMENDED $104,880 $544,342 $87,582
952,491
kWh
$15,774
-
kW-mo/yr
$1,524
-
MMBtu
TOTAL IMPLEMENTED $36,464 $26,369 $25,049
272,270
kWh
$11,415
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs